N-architect
Copyright N-architect

N-architect

  • HOME
  • CONTACT
  • PROFILE
  • PROJECTS
Copyright N-architect

N-architect

MLC 2

Kuala Lumpur, Malaysia
Commerical
20 000m2
2012

 

Located in front of the Melawati hills landscape, this shopping centre aims to bring life into an aging shoplot area. MLC 2 requilifies the aborted MLC robotoc concept, as a rocky and hilly concept to match with the surrounding landscape.

 


 

Situe au premier plan du paysage de Melawati Hills, près de Kuala Lumpur, ce centre commercial a pour but de redynamiser un quartier commerçant vieillissant. MLC 2 prend la suite du projet abandonné MLC, en apportant un concept nouveau, base sur l’idée d’une façade rocailleuse et montagneuse en écho au paysage environnant

Related Posts

PARISCOPE

PARISCOPE

Paris, France Facility 300m2 2014   Paris is often considered the most beautiful city in the world. This is mostly due to its wonderful architecture heritage, giving Paris to be described as a “museum-city”. This project sits in the very heart of Paris, surrounded by some of the most renowned jewels of its history : […]

ZERO WASTE CENTER

ZERO WASTE CENTER

St Denis, France Industrial 5 000m2 2007   Since the last few years, the relationship between society and waste that it produces has dramatically evolved. From a linear way of thinking (product to waste), we are now moving to a cycling vision (product A to waste A to product B …). If this relationship changes, […]

ArtSkin

ArtSkin

Buenos Aires, Argentina Museum 9 000m2 2012   This project suggest an approach at the junction between tangible medias and intangible medias, proposing a space enlightening the moment, the surprise, creating a sensitive and ephemeral experience. This museum design is following this idea by offering flexible spaces, transforming the building according to the exhibition taking […]

ECM OFFICE

ECM OFFICE

Kuala Lumpur, Malaysia Office 3 000m2 2009   Located in Kuala Lumpur emerging middle-high class suburbs, ECM office is the HQ of an international banking company. The existing building needed a refurbishment, as it was covered with marble tiles … Keeping the existing façade structure, the idea of this project was to wrap-up the building […]

LEAVE A COMMENT CANCEL REPLY