N-architect
Copyright N-architect

N-architect

  • HOME
  • CONTACT
  • PROFILE
  • PROJECTS
Copyright N-architect

N-architect

VIVATEL

Kuala Lumpur, Malaysia
Hospitality
7 000m2
2010

 

Sitting on top of the freshly completed huge shopping mall refurbishment, VIVATEL tends to classify itself as being halfway between a business and a boutique hotel. Located in the outer suburbs of KL, in a very active and evolving area, the hotel needed to be iconic. The choice for the façade tries to make a statement with a fully glazed curve curved corner, using LED lights. The hotel stands actually like flag for the whole VIVA development.
The construction was completed in 2013.

 


 

Venant compléter le programme d’un important développent commercial récemment mis en activité, VIVATEL se veut être un hôtel “boutique” abordable. Situe dans la banlieue large de Kuala Lumpur, en pleine reconversion, cet hôtel tente de représenter un emblème pour cette zone. Les choix architecturaux pour la façade tendent à surprendre les usagers par le biais de son enveloppe courbe en verre et l’utilisation de LED entre autres effets de lumière. Ce projet est en quelque sorte une bannière pour l’ensemble du développement.

La construction s’est acheve en 2013.

Related Posts

[Z] ART CENTER

[Z] ART CENTER

St Maurice, France Museum 1 000m2 2006   Highway junction bridges are mega-structures more and more popular to resolve developed city urban and peri-urban traffic. Underneath those over-scaled concrete structures stand generous and challenging left over spaces. The goal of this project was to take advantage of one these to convert it into a prime […]

GRACE HOTEL

GRACE HOTEL

Kuala Lumpur, Malaysia Hospitality 12 000m2 2009   Grace Hotel is a 3-stars business hotel project located in centre of Kuala Lumpur. Sitting on top of an 8-storey shopping mall podium, the 30 storey hotel propose green side walls and roofs. The rooftop of the building integrates three restaurants with garden terrace and spectacular view […]

ZERO WASTE CENTER

ZERO WASTE CENTER

St Denis, France Industrial 5 000m2 2007   Since the last few years, the relationship between society and waste that it produces has dramatically evolved. From a linear way of thinking (product to waste), we are now moving to a cycling vision (product A to waste A to product B …). If this relationship changes, […]

MPL APPARTMENTS

MPL APPARTMENTS

Kuala Lumpur, Malaysia Housing 20 000m2 2008   Sitting on top of an existing office and commercial 6-storey building, MPL apartments’ project had one main constraint: the existing podium can’t support the load of the MPL project. To make this project possible, a huge structure crossing over the existing building has been designed to support […]

LEAVE A COMMENT CANCEL REPLY